网站首页  用户名:密码:记住登录名

Imaginative Journey

个人档案

谭高科

革思设计顾问
室内设计师

博客公告

  • If you are not ambitious, you will not excite people;      
  • and if you can't excite people, you won't make a outstanding man.


           by Thomas Heatherwick

 

contact:328287104@qq.com

         

最近访客

友情链接

统计信息

博客:1171 篇
评论:216
访问:正在读取...

日志

Musée national des beaux-arts

(2010-11-11 08:55)
标签:

March 31st, 2010

Dutch architects Office for Metropolitan Architecture have won a competition to design an extension to the Musée national des beaux-arts du Québec in Canada.

The winning design, announced today, is described as a “cascade of three overlapping boxes”.

See all our stories about Rem Koolhaas/OMA in our special category.

Here’s some info from OMA:

OMA WINS COMPETITION FOR MAJOR MUSEUM EXPANSION IN QUEBEC CITY

New York, 31 March 2010 – The Office for Metropolitan Architecture (OMA), has won the competition for a major expansion to the Musée national des beaux-arts du Québec (MNBAQ). The 12,000m2 new building, a cascade of three overlapping boxes at the juncture of downtown Quebec City and the historic Battlefields Park, will be OMA’s first built project in Canada.

The winner was announced today by MNBAQ President Pierre Lassonde and the Quebec Minister of Culture, Mme. Christine St-Pierre. The design, led by OMA partners Shohei Shigematsu and Rem Koolhaas in collaboration with associate Jason Long, was chosen unanimously from five submissions by internationally renowned architecture offices.

OMA’s expansion of MNBAQ – linked underground with the museum’s three existing buildings – is located on Quebec’s main promenade, Grande-Allée, adjacent to St. Dominique Church. The design aims to integrate the building with the surrounding park and initiate new links with the city. Three stacked galleries of decreasing size – housing contemporary exhibitions (50m x 50m), the permanent contemporary collection (45m x 35m) and design / Inuit exhibits (42.5m x 25m) – ascend from the park towards the city, forming a dramatic cantilever towards the Grande-Allée and a 14m-high Grand Hall, welcoming the public into the new building.

Shohei Shigematsu commented: “Our ambition is to create a dramatic new presence for the city, while maintaining a respectful, even stealthy approach to the museum’s neighbors and the existing museum. The resulting form of cascading gallery boxes enhances the museum experience by creating a clarity in circulation and curation while allowing abundant natural light into the galleries.”

The project will be executed by OMA’s New York office in collaboration with Provencher Roy + Associés Architectes, with an anticipated completion date of fall 2013.

分享到 分享到豆瓣 分享到开心网 分享到新浪微博 分享到人人网
评论 (0) | 阅读 (213) | 类别 museumandTheatre  

所有评论

登录发表评论
用户名   密码   注册